Warning: The magic method Vc_Manager::__wakeup() must have public visibility in /home2/mygreex5/public_html/wp-content/plugins/js_composer/include/classes/core/class-vc-manager.php on line 203

Warning: Cannot modify header information - headers already sent by (output started at /home2/mygreex5/public_html/wp-content/plugins/js_composer/include/classes/core/class-vc-manager.php:203) in /home2/mygreex5/public_html/wp-content/plugins/bluehost-wordpress-plugin/vendor/newfold-labs/wp-module-ecommerce/includes/ECommerce.php on line 197

Warning: Constant WP_CRON_LOCK_TIMEOUT already defined in /home2/mygreex5/public_html/wp-config.php on line 91

Warning: Constant AUTOSAVE_INTERVAL already defined in /home2/mygreex5/public_html/wp-config.php on line 92

Warning: Constant WP_POST_REVISIONS already defined in /home2/mygreex5/public_html/wp-config.php on line 93

Warning: Constant EMPTY_TRASH_DAYS already defined in /home2/mygreex5/public_html/wp-config.php on line 94
GreenPower ESS – Green Power

GreenPower ESS

Tesseract 5K14

A Fully Integrated & VPP Ready Home Battery System

 
  • 5KW Hybrid Inverter
  • 14KWh Battery powered by CATL LFP Cells
  • Integrated EPS power backup system
  • VPP ready

Tesseract 5K14

Store Your Solar Energy

No More Blackouts

Tesseract 5K14 is an fully integrated home battery system with hybrid inverter and intelligent EPS, the battery stores your solar energy for the nights or during power blackouts

GreenPower ESS

Tesseract 5K14

  • The GreenPower Tesseract 5K14 is a highly integrated, all-in-one residential hybrid solar and battery storage system, developed by GreenPower Investment Pty Ltd in partnership with OLiPower, Renac China and supported by CATL , the largest lithium battery manufacturer in the world.
  • The entire unit contains two compartments: the 5KW hybrid inverter unit on the top, and the battery unit at the bottom. Four CATL high-performance and long-life LFP battery modules are installed inside the battery unit to provide 14KWh long-lasting and safe energy to the home.



Register Now  Learn More

The Tesseract 5K14 equips the EMS (Energy Management System) and 4G communication unit which is VPP ready. It can provide real-time monitoring for both energy production and consumption. It equips the integrated EPS (Emergency Power Supply) system which can provide solar and battery power during grid blackouts.


2

GreenPower ESS

200MW/200MWh

LARGE SCALE BATTERY ENERGY STORAGE PROJECT

CROWN SPONSORSHIP

GreenPower ESS

GreenPower is developing a large-scale Battery Energy Storage System (BESS) project with Crown Sponsorship from the South Australian Government. The project will build a 200MW/200MWh BESS in South Australia providing a more secure and affordable power supply for South Australia. It will directly connect to 275V power grid and AEMO energy trading market.

GreenPower ESS

The BESS Project is located in Templers, South Australia